TOWER SECTION HANDLERS USING REACHSTACKERS................................... BA-110C + BA-194

  The best Solution for Tower Section Handling:

In order to manage a Tower Section Yard actually it is only necessary to have:
  • - 2 x Reachstackers
  • - 2 x BA-110 : TEC’s Multipurpose Platform
  • - 2 x BA-194 : TEC’s Protected G-Hook

It Maximizes the available space.
It Minimizes Time involved in every load / unload operation.
It Minimizes the number of operations required.

As no cranes are necessary the operative cost of this operations gets drastically reduced


The Driver can easily manage to catch the Tube with the TEC G-Hook (BA-164) using the Reachstacker movement.

Using the 2 Reachstackers at the same time in a perpendicular arrangement we are able to reduce the aisle space, maximizing the total number of tower sections to be stored.